Truckee Hall Bath Remodel & Whole Home Updates
Project Overview
Work in the hall bathroom started with staging, masking, dust barriers, and floor protection run outside the bath so the rest of the house stayed usable. The vanity was disconnected and the 97 inch cabinet and granite top were removed, then the floor tile and its mortar bed came out across the full 60 square feet.
Opening the pony wall zone exposed rot and mold. The affected area was probed at the edges and cut back to sound material, and the framing and joists were HEPA vacuumed, scrubbed, and treated. Moldy drywall was removed, blocking was installed, and a 3/4 inch plywood patch was cut, fit, glued, and fastened to bring the subfloor back to a flat, sound plane.
The tub surround was rebuilt next. The tub surface was protected and all tile and backer came off the three surround walls, roughly 50 square feet, so the framing behind could be inspected for rot and moisture. GoBoard panels were cut, fit, and fastened to manufacturer specification, then GoBoard joint sealant was run at every seam, corner, tub flange, and penetration before any tile went up.
Schluter Ditra uncoupling membrane was set over the full bathroom floor, with the toilet flange height coordinated against the new membrane and tile buildup. Twelve by twenty four matte porcelain field tile was laid on the floor and across the three surround walls, with cuts made at the valve, spout, showerhead, and tub lip. Tile baseboard was set with Schluter Jolly edge trim, the work was grouted and sealed, and silicone was run at the change of plane joints and the tub to tile joint.
A 96 inch double vanity was set, leveled, shimmed, and scribed to the wall. Both sinks were reconnected with new faucets, supply lines, P traps, and drain assemblies and tested for leaks. The open wall end left by the former pony wall was patched and textured to match, and the mixing valve trim, tub spout, showerhead, and drain cover went back on.
With the wet work finished, interior refinishing followed. The hickory floors were sanded and refinished with a partial fill and recoat, sixteen stair treads were sanded and finished, and the interior was primed and two coated throughout, with the bathrooms taken in a lighter color. Small drywall repairs were made ahead of paint.
Outside, a section of exterior wall was opened for siding and insulation repair with the associated electrical work, new sconces were mounted on the restained siding, and three exterior garage doors were sanded, masked, and stained. The decks were pressure washed and cleaned, screws were counter sunk, cracks were cleaned out, and the boards were sanded and two coated with stain.
The rest of the work was closed out across the same window. The stairway handrail was remounted on iron brackets, two wine refrigerators were replaced, the primary bath faucet was swapped and its electrical and drywall repairs completed, the garage drywall was patched, and demolition debris was hauled off in dump trailer runs.
Materials Used
Substrate & Waterproofing
Johns Manville GoBoard 1/2" tile backer panels, three wall tub surround
GoBoard joint sealant at seams, corners, tub flange, and penetrations
Schluter Ditra uncoupling membrane over the full bathroom floor, with Ditra fabric tape at the seams
Unmodified thinset for the membrane, thinset mortar for floor and surround tile
Tile
12" x 24" matte porcelain field tile in gray, floor and tub surround
Schluter Jolly 3/8" edge trim at the tile baseboard
Grout, silicone caulk at change of plane joints, and a new door threshold
Cabinetry & Plumbing
96" double bathroom vanity
Two new hall bath faucets, plus a replacement faucet in the primary bath
Supply lines, P traps, drain assemblies, and shutoff valves
Framing, Drywall & Remediation
3/4" plywood subfloor patch, blocking lumber, fasteners, construction adhesive
Drywall, corner bead, joint compound, and mesh tape, textured to match existing
Concrobium mold treatment, Kilz PVA primer, HEPA vacuum
Interior Finishes
Hickory floor sand and refinish, partial fill and recoat
Sixteen stair treads sanded and finished
Interior primer and two coat paint throughout
Wall mounted handrail on iron brackets
Exterior
Deck stain, applied after pressure washing, screw counter sinking, and sanding
Stain for three exterior garage doors
Exterior wall sconces
Siding and insulation repair materials
Challenges & Solutions
A few conditions shaped how this project came together:
Rot and mold behind the pony wall were only visible once demolition opened the area, so remediation and subfloor repair had to be worked out in the field rather than priced in advance
The subfloor was cut back to sound material and rebuilt with blocking and a 3/4 inch plywood patch before any tile started, and Schluter Ditra was run over the full floor to isolate the new tile from the repaired substrate
The existing tub was retained, so the new GoBoard substrate and tile surround had to be built to the tub's existing dimensions, with joint sealant carried through every seam, corner, tub flange, and penetration
The toilet flange height had to be coordinated against the added membrane and tile buildup so the reset toilet would seal correctly
Bathroom work ran alongside whole house floor refinishing and painting, so wet tile, sanding, and paint had to be sequenced to keep dust and finishes from crossing
Floor protection was maintained from the entry through the work areas for the length of the project, in a house that stayed accessible throughout
The hall bathroom was rebuilt from the joists up, and the floors, paint, decks, and exterior finishes were brought back across the rest of the property.