Truckee Cabin Siding Replacement & Deck Rebuild

Project Overview

Windows, doors and light fixtures were masked and protected on every work elevation, and the decking, landscaping and walkways below each one were covered. Debris containment was set at the base of each elevation and the protection stayed up until the work was finished.


Access drove the sequence. A three tier scaffold stack with leveling jacks and outriggers was erected at the rear elevation, with pressure treated mudsills set under every frame leg and outrigger foot to bear on native grade. Guardrails went on and all working levels were planked. At the remaining elevations the crew worked from ladder platforms with fall protection, repositioned each time they moved to the next panel.


At each of the twelve damaged locations the battens and trim came off and the full panel was cut out rather than patching around the holes. That left the sheathing, framing and weather resistive barrier behind each opening exposed and able to be inspected, and the barrier was repaired or patched where it needed it. New T1-11 plywood siding went in, 19/32 inch with an 8 inch on center groove pattern chosen to match the existing panels, fastened at manufacturer spacing. Battens went back on to the existing profile and all edges and penetrations were caulked and sealed.


Two locations took extra work. One replacement panel had to be cut to fit around the electrical meter base, the service mast and the conduit; blocking was installed behind every cut edge to support the panel, the weather barrier was patched and shingle lapped at the cut, and the penetrations were sealed with flashing tape and exterior sealant. The other was the panel under the upper deck, which had to be cut to size and maneuvered into place inside about 30 inches of clearance.


On the decks, the existing boards came off the 163 square foot lower deck and the 36 square foot upper balcony, remaining fasteners were pulled from the joists, and the exposed framing was inspected before anything new went down. New 2x6 Construction Heart redwood was laid with consistent spacing and fastened with GRK Silver Star screws set flush and evenly aligned, with boards cut and fit at the stair landing and around every railing post. Failed cable railing fittings were replaced and re-terminated, the cables were re-tensioned to a consistent deflection, and the post connections and top rail fasteners were checked and tightened.


Finishing waited on the wood. New redwood carries a mill surface that resists finish penetration, so the boards were given time to dry before anything was applied. The new decking and the existing stair treads were then sanded, and a solid body stain was applied to all new deck surfaces rather than a film forming paint, which does not hold on horizontal decking. The replaced siding panels were stained to the existing exterior color, and the siding, trim and deck were brought to one finish across the building. Removed panels and deck boards were loaded and hauled out, work areas were swept at the end of each day, and the deck surfaces and grounds were cleaned at completion.

Materials Used

Siding

  • T1-11 plywood siding panels, 19/32 in nominal, 8 in on center groove pattern, 4x8

  • Battens matched to the existing profile

  • Weather resistive barrier patch material and flashing tape

  • Blocking, fasteners, caulk and exterior sealant

Decking

  • 2x6 Construction Heart redwood, S4S, roughly 199 square feet across the lower deck and upper balcony

  • Construction Heart grade, SFM listed for Wildland Urban Interface use, Class B flame spread

  • GRK Fasteners #9 x 2-3/8 in Silver Star flat head deck screws

Railing

  • Replacement cable fittings and terminations matched to the existing system

Finish

  • Solid body stain on all new deck surfaces and the existing stair treads

  • Replaced siding panels stained to the existing exterior color

  • Siding, trim and deck painting and staining to one finish

Access & Protection

  • Three tier scaffold stack with leveling jacks and outriggers at the rear elevation

  • Pressure treated 2x10 mudsills under all frame legs and outrigger feet

  • Ladder platforms and fall protection at the remaining elevations

  • Plastic sheeting, masking tape and drop cloths, with debris containment at the base of each elevation

Challenges & Solutions

Several conditions shaped the work:

  • A three story cabin, with most of the damaged panels on the upper levels and reachable only from a three tier scaffold stack at the rear elevation or from ladder platforms elsewhere

  • The scaffold base had to be set on pressure treated mudsills and leveled on native grade

  • One panel sat beneath the upper deck with roughly 30 inches of working clearance, so it had to be cut and worked into place within that space

  • Another panel ran behind the electrical meter base, mast and conduit, and had to be cut around them with blocking behind every cut edge and the weather barrier shingle lapped at the cut

  • Panels were cut out in full rather than patched, so the sheathing, framing and weather barrier behind each one could be inspected before the new panel went on

  • The new T1-11 had to match the existing 8 inch on center groove pattern and 19/32 inch thickness, and the battens had to match the existing profile

  • New redwood carries a mill surface that resists finish penetration, so the staining schedule was set around letting the boards dry first

  • A solid body stain was specified on the horizontal deck surfaces, because a film forming paint does not hold there

Twelve siding locations and roughly 199 square feet of decking were replaced, and the exterior came back to one consistent color.