Tahoe City Roof Deck Conversion & Refinish
Project Overview
The investigation phase lifted deck boards at three targeted areas: the southeast corner over the garage at one drain, the junction near the front door at the second drain, and a mid-deck control spot. Both deck drains were flow-tested, the under-board waterproofing membrane was inspected and photo-documented at each lift, and deck slope was checked on all three sections to confirm fall away from the structure.
For the construction phase, the entry, garage frontage, and landscaping below the work area were protected, and the waterproofing membrane and drainage path were protected throughout. Roughly 308 square feet of mahogany decking was removed from the garage section, about 28 feet by 11 feet, with membrane protection as the governing priority on every board. The salvaged mahogany was stacked on site and stayed with the owner rather than going to the dump.
Pressure treated blocking was installed to and between the existing sleepers at the return before the walkway, and a breaker board was set at the transition between the new section and the mahogany that was staying. TimberTech Advanced PVC decking in Vintage Collection Mahogany was then installed over the existing pressure treated sleepers and face fastened with TimberTech's color matched plug system. Fastener length was verified against sleeper height before installation, so that no fastener could reach the roofing membrane below.
Removable framed vent panels were built and installed between the posts, above the hidden gutter at the end of the sleepers, running roughly 28 linear feet. The panels give continuous airflow under the deck boards and over the garage, and they come off with corrosion resistant fasteners when the gutter needs cleaning or inspection. Because the home sits in a Very High Fire Severity Zone, the vent openings use an ember rated, Cal Fire listed product rather than plain screen mesh.
The remaining mahogany decking and stairs were pressure washed and cleaned, fasteners were countersunk as needed, debris was cleared from the board gaps, and the boards were sanded with belt and orbital sanders to take out the cupping and discoloration. A hardwood stain and sealer were applied to the sanded decking and stairs. The hot tub stayed in place for the duration of that work.
Materials Used
Decking
TimberTech Advanced PVC, Vintage Collection Mahogany, approximately 308 square feet
TimberTech color matched plug fastening system, face fastened
Breaker board at the section transition
Pressure treated blocking at and between the existing sleepers
Ventilation
Removable framed vent panels, approximately 28 linear feet, between the posts above the hidden gutter
Ember rated, Cal Fire listed vent material (WUI compliant)
Corrosion resistant removable fasteners
Refinishing
Pressure wash and clean of the existing mahogany decking and stairs
Belt and orbital sanding to correct cupping and discoloration
Hardwood stain and sealer
Investigation
Targeted board lifts at both deck drains and a mid-deck control location
Drain flow testing
Under-board waterproofing membrane inspection with photo documentation
Slope verification across all three deck sections
Retained In Place
Existing pressure treated sleepers
Existing waterproofing membrane over the garage
Salvaged mahogany decking, stacked on site for the owner
Hot tub, left in place through the refinishing
Challenges & Solutions
Several conditions shaped the work:
The garage section decking sits directly over a waterproofing membrane, so every removal and fastening decision was made around not penetrating or damaging it
Fastener length was verified against sleeper height before installation so that no fastener could reach the roofing membrane below the sleepers
The home sits in a Very High Fire Severity Zone, so the new vent openings required an ember rated, Cal Fire listed product rather than plain screen mesh
Vent panels had to be removable, because the hidden gutter at the end of the sleepers needs periodic cleaning and inspection
New composite and retained mahogany meet at a section transition, which required added sleeper blocking and a breaker board to make a clean joint between two different materials
The hot tub remained in place on the mahogany section through the sanding and refinishing
The investigation scope was open ended by nature, since membrane and drainage condition could not be assessed until boards came up
The garage section now runs on a ventilated PVC deck over the membrane, and the rest of the deck was brought back in a matching mahogany tone.